Chinese English Japanese
Return

LCD

LCD

更多分类
Home>Product>LCD
GLL-LTC395A GLL-LTC395A
GLL-LTC395A

Display size:3.95 inch

Pixels:480*480(RGB)

Display mode:IPS

Display color:16.7M

Interface:RGB

Viewing angle(°):ALL

Brightness(cd/m2):500

Contrast ratio:800

Operation temperature(℃): -20~+70

Storage temperature(℃): -30~+80

Out line(mm):74.66*76.54*2.08

Display area(mm):71.86*70.18

Application:Industrial Control

Hotline:

+86 13428981303

Product Features
  • Anti blackening Anti blackening the screen content can be clearly seen from any angle.

  • 3A processing "3A" processing Simultaneously equipped with AG+AR+AF processing.

  • Low-power consumption Low-power consumption Extremely low power consumption, the lowest in the industry.

  • High sensitivity High sensitivity Fast scanning and refresh rate, startup below 30MS, excellent accuracy and linearity.

  • Anti-noise Anti-noise Hardware and firmware can be matched to meet strict EMI/RFI standards.

  • Optical binding Optical binding After full bonding, the screen's seismic resistance is increased, reducing the chance of damage.

Production Process

COG/Fully automatic binding process 01

COG/Fully automatic binding process This process is mainly to bind the IC and FPC to the LCD panel until the FOG is formed.

LCM-Fully automatic film process 02

LCM-Fully automatic film process In this process, FOG and BLD are bonded until LCM is formed.

Post film process 03

Post film process This process is mainly to attach the auxiliary materials to the formed LCM.

LCM electrical burning test 04

LCM electrical burning test This process is mainly to test the performance of the formed LCM.

TLCM/Automatic film process 05

TLCM/Automatic film process This process is mainly to bond LCM and TP until TLCM state.

Defoaming furnace process 06

Defoaming furnace process This process is mainly to defoam the laminated TLCM.

FQCinspection area 07

FQCinspection area This process is mainly to carry out the final process test of the laminated TLCM finished product.

Outgoing quality control 08

Outgoing quality control This process is mainly for TLCM finished product quality inspection before shipment.